I started laying brick before the gravel compacted all the way. Now the whole line is off and I'm redoing the foundation. Who else has lost time trying to beat the weather or a deadline?
I've noticed that even from the same supplier, the consistency changes batch to batch. It makes planning out a day's work nearly impossible when you can't trust the materials. What's your method for dealing with this kind of inconsistency?
I always stuck with string lines and my trusty level for dry stack walls. A friend convinced me to try his laser on a recent garden project. It kept everything so straight and even from the start. Now I get why some masons love them for consistency. I was totally wrong to ignore this tool for so long.
He had us stack pillows to practice laying bricks.