Saw a mobile crane setup on a slope near Denver that looked sketchy
I was driving through the foothills last Friday and passed a job site where they had a 90 ton mobile crane setting up on about a 7 degree incline, no cribbing under the outriggers on the downhill side. The operator was already lifting a steel beam while his spotter was yelling at him about the level indicator. I know some guys run out of leveling pads, but is that kind of thing common in mountain work? I've only done flat ground sites for 6 years, so I'm wondering if there's a trick to stabilizing on grades like that or if we should be calling that out every time. Has anyone else had to walk a job because the ground crew ignored the setup plan?
2 comments
Log in to join the discussion
Log In2 Comments
joel_butler22d ago
That operator must have a death wish or a really good insurance payout coming. Sounds like the spotter was the only one with a functioning brain on that site. I'd be making a call to whoever manages that job, cause 'the trick' on grades is usually called math and cribbing.
7
grantmartinez22d ago
Used to think spots were optional, but you just changed my mind.
-1