The gate log at our Beaumont site showed 41 trucks checked in but only 33 ever hit the pour
I pulled the paperwork after we blew a deadline and 8 loads just vanished between the gate and the deck. Turned out nobody was tracking truck turnaround, so rigs sat 25 minutes waiting on a spotter who was on lunch. Who else has caught a gap like that between sign-in and actual work?
We had the same thing happen and fixed it by putting a timestamp on every gate ticket plus a hard rule that no truck waits more than 10 minutes for a spotter before the gate calls the super. The log only tells you who showed up, not who actually got worked, so someone has to own turnaround time or loads will keep slipping through. Start checking gate time against pour time daily and the gaps show up fast.