Hit 200 panel swaps after 5 years straight and I still fumble the zone list on the last one
Pulled the 200th can of my career on a Tuesday in Fresno, a 20 zone job in a house built in '62, and I realized I've never once finished a re-label without double checking zone 4 twice. The old wiring in these places always throws a curve, this one had a door contact spliced into the motion loop by some guy back in the 90s. Any of you keep a cheat sheet for labeling when the existing zones are a total mess, or do you just gut the whole list and start fresh?