Showerthought: picking between stayin on the 40 ton or jumpin to the 90 ton for the tilt-up job
Two summers ago I had to pick between stickin with the 40 ton Grove I knew inside and out or movin over to the 90 ton for a big tilt-up job outside of Bakersfield, and I went with the bigger crane. The money was better, maybe $3 an hour more, but I was nervous because I had barely run anything over 60 tons and the panels were heavy as hell. First week was rough. I was slow on the setup, second-guessed my swing every time, and the rigger kept giving me looks like I was gonna drop a wall on him. By the third week though something clicked and I got comfortable with the load charts enough to stop white-knuckling the handles. In the end I'm glad I took the jump but I still wonder if I should've asked for more seat time on the bigger machine before the job started. Has anyone else had to pick between the crane you know and the one that pays more? How'd you handle the learning curve?