Vent: Back filled up with water 3 days after I sealed it
Finished a patio pour in Rochester, MN last Tuesday, and the slope ran flat so it pooled after the first good rain. Client called, I tore out 2 sections and re-poured at 2% before he could file a complaint. Anyone else fight the slope on small patios or do you build in an extra inch from the start?