Rant: I was floating slabs too wet for years until a finisher in Tucson set me straight
I used to add water at the truck anytime the mix felt stiff. Figured it made the pour easier and I was the one holding the float, so what did it matter. Then about 3 months ago a guy named Rick on a garage slab in Tucson told me to watch him instead. He had me cut back to about 4 gallons less per yard and the bleed water stopped pooling within 15 minutes. The next morning the control joints didn't chip and the surface wasn't dusty. Now I time my water by the slump and the weather, not by feel. How do you all decide when to add water on a hot pour?