Can we talk about that 28 day cure rule for slabs on grade?
I was flipping through an old ACI reference at a job site trailer in Fresno last month and saw that a 6 inch slab on grade should cure at least 7 days before you even think about loading it, and full design strength takes 28 days. Half the crews I know pull forms and park trucks on it by day 3. The old timers on one side say you let it sit and lose money while the GC screams at you. The other side says rushing it means hairline cracks show up in a year and the homeowner blames your finish. I get both arguments but I lean toward waiting it out when the schedule allows. What's the shortest cure time you've gotten away with before a customer noticed a crack?