Vent: guy on my crew in San Diego set every corner block dry and now the wall's 3/4" out
Spent 20 minutes with a 4 foot level showing him why you wet the first course on a 90 degree day, and he still swears the mud was fine, so has anybody found a way to fix a racked corner without tearing the whole run down?