Two weekends gone because my pavers wouldn't sit level over a 6 inch spot of old concrete
So I had this little fire pit area in back that I was going to knock out in one Saturday. Day one I dig out the grass and hit a chunk of old patio slab buried about 4 inches down, no idea how long it had been there. I figure I'll just chip it out with a sledge, except it's like 8 inches thick and it takes me two full afternoons and a hammered thumb to bust up. Then the sand base won't pack down even because of the crater I left, so I'm running back to the yard for six more bags of paver base at 11 bucks each. Total time from first shovel to last paver set: 19 days, two of them in the rain with a tarp over my mess. Should I have just rented a small jackhammer on day one instead of playing hero with a sledge?