Saw a guy build a whole fire pit from free brick in one weekend at the Oak Street block party
Our street had a block party two Saturdays ago and this dude named Marcus showed up with a wheelbarrow of old brick he pulled off a demo site. He stacked it in a dry ring on his bare dirt, no mortar, no kit, and had flames going in about 40 minutes. I had been quoting $900 for a paver kit online for my sad little grass patch, and his thing looked better by the end of the night. A week later I found 60 free brick on a curb 3 blocks over and did the same stack behind my shed. How do you all handle the bottom layer so it doesn't sink after a good rain?
Did you dig out the topsoil first or just stack right on the grass? I did mine on bare dirt too and skipped the digging part, so now I am wondering if that was a mistake. Curious if a layer of gravel or sand under the first course actually stops the sinking or if it just slows it down.