Am I the only one who thought gravel patios were lazy until my concrete cracked after one winter?
Last fall in Fort Worth I poured a 10x12 concrete pad for our fire pit area, and by February it had two big cracks running right through the middle. I was ready to tear the whole thing out and start over, but my neighbor Dan said to just lay gravel on top instead and save myself 800 bucks. I figured it would look cheap, but I put down 3 inches of pea gravel over the slab and it actually looks better than the concrete ever did. Now I'm wondering why I ever thought poured concrete was the only real option back there. Anybody else switch to gravel after a slab failed on them?
Ngl I saw a guy on a landscaping forum say the same thing, that gravel over a cracked slab is the move because it hides everything and still drains fine. He said if you go with pea gravel it kinda sinks into the cracks and locks things down. My uncle did 4 inches of crushed granite over his old patio and it held up through two freezes no problem. Only thing people warned about is weeds popping through if you skip the fabric underneath. Did you put down a layer of weed blocker first or just dump the gravel straight on the slab?