An old hand at the Tulsa hangar told me to quit chasing wire runs by eye, and he was right
I was helping pull a bundle through a tight spot near the aft pressure bulkhead a couple months ago, and a tech with 22 years on me watched me fish around with a flashlight for 10 minutes without saying a word. He finally handed me a piece of lacing tape and said, "Tie it off and label both ends first. You will save yourself a call at 2 a.m." I had always done it the fast way, threading blind and trusting the prints. Turns out labeling every lead with a piece of tape and a Sharpie added maybe 4 minutes to the run but saved me a solid hour of tracing wires back the next day. It hit different because I always figured labeling was for the guys who were slow, not the ones who knew better. Now I want to know how the rest of you handle cramped runs behind panels where you can barely get a hand in. Do you label as you go or trust the wire numbers?