Rant: the trench wall at my local dig site looked totally different after two weeks of rain
I volunteer at a small dig site outside Tucson and the north wall of our trench was nice and clean when I started in April. Then we got about 6 days of rain over two weeks and the whole thing slumped in, burying a hearth we had just started exposing. Our lead said the clay-heavy soil swells when it gets wet and loses its grip, so the wall basically slid down like a mudslide. We spent three days re-cutting the wall and troweling back down to where we were, and I learned more about soil from that mess than from any book. Has anyone else had weather wreck a unit mid-excavation, and what did you do to keep it stable after?