Can we talk about the client in Tulsa who asked me to label every zone in plain English?
Had a walkthrough about 4 months back where the homeowner asked why her keypad showed "Zone 7" instead of "Back Door." I figured it was no big deal, but she pushed on it and said if something goes off at 2am she doesn't want to be decoding a number. So now I budget an extra 20 minutes on every panel job to type out real labels, even on the cheap 8-zone boards. Last week I did a house near Broken Arrow and the guy actually texted me after to say thanks, he could tell which door tripped from his phone. Costs me a little time per job but I get fewer callback questions about what a fault means. Curious if you all label zones on every install or just the bigger panels.