Appreciation post: the guy who framed my garage in Boise taught me to check the sill plate level twice
I keep seeing crews slap down a sill plate and just trust the concrete guy. My old lead in Boise made us check it at 5 points with a 6 foot level before anything else went up, and sure enough there was a 3/8 inch dip at the back corner. Cost us 20 minutes to shim it and saved us from a racked wall that would've shown up when the door went in. I've run into two jobs since then where the framer skipped that step and both had trouble hanging drywall square. How do you guys handle a bad pour when the homeowner doesn't want to pay to fix it?