Warning: quit floating every pour and my slabs stopped cracking
I used to float every single pour right out of the chute, thinking the sooner the better. Last spring I had three driveways in Waco crack along the same control joint and the homeowner was not shy about it. Now I let the concrete sit and bleed for 20 to 30 minutes before I even touch a float, depending on wind and mix. The finish fights you a little more when it sets up, but the cream is way stronger and I have not had a shrink crack on a driveway since. My old lead called it laziness and I told him to come look at the last 4 slabs I poured in June. Anyone else time their float off the bleed water instead of the truck schedule?