Watched a CAN bus fix go from 40 minutes to 6 with one small change to my work order
Six months ago a squawk on a CRJ200 bleed valve was eating half my shift because I kept starting at the LRU and working backward through the schematic. Then I started jotting the fault code and the exact bus segment on a sticky note before I ever touched a wrench. The difference is real. My last three faults, including a fuel quantity issue out of Denver, each ran under 10 minutes of actual diagnosis because I already had the segment narrowed down on paper. It sounds dumb when I type it out. It is not the tooling, it is the two minutes of thinking first instead of grabbing the meter. I pulled the sticky note trick from a guy who retired out of our shop in 2019 and I always thought he was just slow. Turns out he was fast, just quiet about it. Anyone else have a habit like this that seems dumb but ends up cutting your time way down?