Just realized a 10 minute coax check saved me a 3 day sign-off delay, but I can't tell if it's luck
We had a nav unit passing BITE but failing the flight line check every other day last month at our hangar in Tulsa. I started adding a quick 10 minute sweep of every coax connector with a torque wrench and a visual before sign-off, and the intermittent faults dropped from about 6 a week to zero over 3 weeks. One side of me says this is just basic workmanship that everyone should do anyway. The other side says the pressure to turn jets fast means nobody does it, so maybe it needs to be a written step. My lead says I'm wasting time on checks the manual doesn't call for. But the manual also didn't catch the loose BNC that ate my whole Tuesday. Where do you all land, is this a real habit to build or am I overdoing it?